MACHINE OPERATIONS AND CONTROLS
OPERATION
3-146
2.
Turn swing lock switch (2) ON and check that the swing
lock monitor lights up.
3.
To complete the warm-up operation of the hydraulic equip-
ment more quickly, set the working mode to P mode
(heavy-duty mode).
For details of the procedure for setting the working mode,
see “Working Mode Selector Switch (3-26)“.
4.
Move lock lever (3) slowly to the FREE position (F), then
raise the bucket from the ground.
5.
Turn fuel control dial (4) to a point midway between low
idling (MIN) and full speed (MAX).
NOTICE
When the work equipment is retracted, take care that it
does not interfere with the machine body or ground.
6.
Move right work equipment control lever (5) slowly in the
direction to pull in the bucket (D). Operate the lever to the
end of its travel and hold it in position for 30 seconds.
7.
Move right work equipment control lever (5) slowly in the
direction to push out the bucket (C). Operate the lever to
the end of its travel and hold it in position for 30 seconds.
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...