SAFETY
SAFETY MACHINE OPERATION
2-25
OPERATION
2
CHECKS BEFORE OPERATION
When carrying out the checks, move the machine to a wide area where there are no obstructions, and operate
slowly. Do not allow anyone near the machine.
q
Always fasten your seat belt.
q
Check that the movement of the machine matches the display on the control pattern card. If it does not match,
replace it immediately with the correct control pattern card.
q
Check the operation of the work equipment, travel system and swing system.
q
Check for any problem in the sound of the machine, vibration, heat, smell, or gauges; check also that there is
no leakage of oil or fuel.
q
If any problem is found, carry out repairs immediately.
SAFETY RULES FOR CHANGING MACHINE DIRECTIONS
q
Always operate the machine only when seated.
q
Do not allow anyone apart from the operator to ride on the
machine.
q
Check that the travel alarm works properly.
q
Always lock the door and windows of the operator's com-
partment in position (open or closed).
On jobsites where there is a hazard of flying objects or of
objects entering the operator's compartment, check that
the door and windows are securely closed.
q
If there is an area to the rear of the machine which cannot
be seen, position a signal person. Take special care not to
hit other machines or people when turning or swinging the
machine.
q
Before travelling, sound the horn to warn people in the
area.
q
Before travelling, check again that there is no one in the
surrounding area, and that there are no obstacles.
q
Before traveling, set the machine so that sprocket (1) is
behind the operator's seat.
If sprocket (1) is in front of the operator's cab, the machine
moves in the opposite direction from the operation of the
lever (front and rear travel is reversed, left and right steer-
ing is reversed). Be extremely careful when operating the
machine in this situation.
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...