MAINTENANCE
MAINTENANCE PROCEDURE
4-27
NOTICE
Be sure to install the air cleaner element facing in the cor-
rect direction.
Install so that the bottom of the air cleaner element cylin-
der (face where no hole is drilled) (B), (C) is at cover (3)
end. If the direction of installation is mistaken, there is
danger that it will cause breakage of the air cleaner ele-
ment or serious damage to the engine.
8.
Replace O-ring (8) of cover (3) with a new part.
NOTICE
When inserting the element, if the rubber at the tip is swol-
len or the outer element is not pushed in straight, and
cover (3) is assembled by force to hook (2), there is danger
that the hook and air cleaner body may be damaged, so be
careful when assembling.
9.
Install cover (3) as follows.
1) Align cover (3) with the element.
2) Hook the tip of hook (2) to the protruding part of the air
cleaner body and lock it in position.
3) When locking hooks (2) in position, apply the hooks in
turn on opposite sides (top, bottom, left, right) in the same
way as when tightening bolts.
4) Always install cover (3) so that the evacuator (4) is facing
the ground (A).
5) When cover (3) is installed, check that the clearance
between the air cleaner body and cover (3) is not too large.
If it is too large, install again.
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...