MAINTENANCE
MAINTENANCE PROCEDURE
4-49
EVERY 50 HOURS MAINTENANCE
4
LUBRICATING
4
NOTICE
q
If any abnormal noise is generated from any greasing point, carry out greasing regardless of the
greasing interval.
q
Carry out greasing every 10 hours for the first 50 hours on a new machine.
q
After the machine was subjected to jobs in the water, be sure to grease the wet pins.
1.
Set the machine to the greasing posture shown on the
right, lower the work equipment to the ground, then stop
the engine.
2.
Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed
out.
(1) Arm-Link coupling pin (1 place)
(2) Arm - Bucket connection pin (1 place)
(3) Link coupling pin (2 places)
(4) Bucket cylinder rod pin (1 place)
(5) Bucket-Link coupling pin (1 place)
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...