OUTLINE OF SERVICE
MAINTENANCE
4-6
q
If the engine overheats, wait for the engine to cool before adding coolant.
q
If the coolant level is low, it will cause overheating, and will also cause problems with corrosion due to air
entering the coolant.
GREASE
4
q
Grease is used to prevent seizure and noises at the joints.
q
This construction equipment is used under heavy-duty conditions. Always use the recommended grease and
follow the change intervals and recommended ambient temperatures given in this Operation and Maintenance
Manual.
q
The nipples not included in the maintenance section are nipples for overhaul, so they do not need grease.
If any part becomes stiff after being used for long time, add grease.
q
Always wipe off all of the old grease that is pushed out when greasing.
Be particularly careful to wipe off the old grease in places where sand or dirt sticking in the grease would
cause wear of the rotating parts.
CARRYING OUT KOWA (Komatsu Oil Wear Analysis)
4
KOWA is a maintenance service that makes it possible to prevent machine failures and downtime. With KOWA,
the oil is periodically sampled and analyzed. This enables early detection of wear of the machine drive parts and
other problems.
We strongly recommend you to use this service. The oil analysis is carried out at actual cost, so the cost is low,
and the results of the analysis are reported together with recommendations which will reduce repair costs and
machine downtime.
KOWA ANALYSIS ITEMS
q
Measurement of density of metal wear particles
This uses an ICP (Inductively Coupled Plasma) analyzer to
measure the density of iron, copper, and other metal wear
particles in the oil.
q
Measurement of quantity of particles
This uses a particle quantifier index measurement machine
to measure the quantity of iron particles of 5
μ
or more,
enabling early detection of failures.
q
Others
Measurements are made of items such as the ratio of water in the oil, density of the antifreeze coolant, ratio of
fuel in the oil, and dynamic viscosity, enabling a highly precise diagnosis of the machine's health.
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...