ATTACHMENTS AND OPTIONS
SUPER LONG FRONT BOOM AND ARM
6-51
LEFT WORK EQUIPMENT CONTROL LEVER (3)
(with auto-deceleration device)
WARNING
If any lever is operated when in the deceleration range, the
engine speed will suddenly increase, so be careful when
operating the levers.
This lever is used to operate the arm and upper structure.
When the lever in Neutral (N) position, the upper structure and the arm will be retained in the position in which they
stop.
RIGHT WORK EQUIPMENT CONTROL LEVER (4)
(with auto-deceleration device)
WARNING
If any lever is operated when in the deceleration range,
the engine speed will suddenly increase, so be careful
when operating the levers.
This lever is used to operate the boom and bucket.
When the lever in Neutral (N) position, the boom and the bucket will be retained in the position in which they stop.
NOTICE
q
For levers (2), (3) and (4), the engine speed changes as follows because of the auto-deceleration
mechanism.
q
When the travel lever and work equipment control levers are at neutral, even if the fuel control dial is
above the mid-range position, the engine speed will drop to a mid-range speed. If any of the levers are
operated, the engine speed will rise to the speed set by the fuel control dial.
q
If all control levers are set to neutral, the engine speed will drop by approx. 100 rpm, and after approx.
4 seconds, the engine speed will drop to the deceleration speed (approx. 1400 rpm).
AM089560A
Arm operation
Swing operation
(A) Arm OUT
(C) Swing to right
(B) Arm IN
(D) Swing to left
N (Neutral)
AM089570A
Boom operation
Bucket operation
(1) RAISE
(3) DUMP
(2) LOWER
(4) CURL
N (Neutral)
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...