HIGH REACH DEMOLITION MANUAL
TRANSPORTATION
7-51
INSTALL THE EQUIPMENT ONTO THE TRAILER
12. Carefully lower the work equipment into the trailer bed so that stand A settles onto the trailer and stand B
remains lifted off the trailer.
13. Secure the work equipment to the trailer. It is the responsibility of the transporting company to ensure the load
is safely stowed.
DISCONNECT THE EQUIPMENT FROM THE BASE MACHINE
14. Relieve the pressure in the hydraulic circuits by removing the
filler cap from the hydraulic oil tank and operating the controls
of the machine.
CAUTION
Make sure that all equipment is clean at all times when
removing hydraulic power lines. Particularly ensure that no
foreign matter enters the hydraulic circuit. When hydraulic
lines are separated, make sure that all open ends are
plugged.
A
B
A
B
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...