INSTALLATION AND REMOVAL
HIGH REACH DEMOLITION MANUAL
7-34
CAUTION
Do not slew the upper structure of the high reach demolition
machine with the additional counterweight installed, with
only demolition boom 1 installed
18. Using suitable lifting and support equipment, remove the
additional demolition counterweight from the main demolition
counterweight. Eyebolts are provided with the machine for
this purpose.
Refitting the High reach Demolition Equipment is achieved by fol-
lowing steps above in the reverse order (start with step 17 and fin-
ish with step 1.
CAUTION
Whenever installing work equipment, always complete the installation by purging the hydraulic circuits of
air. Follow the steps in PURGING AIR PROCEDURES (7-42).
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...