MACHINE OPERATIONS AND CONTROLS
OPERATION
3-178
REMARK
When installing the bucket, for arm pin portion (A), fit O-ring (3)
to bucket (4) in the position shown in the diagram on the right.
After inserting the pin, fit it in the standard groove.
For link pin portion (B), install the bucket with O-ring (3) fitted in
the standard groove.
4.
Install the stopper bolts and nuts for each pin, then grease
the pin.
REMARK
Lubricate with grease thoroughly until the grease comes out
from the end face.
When replacing the bucket, replace the dust seal if it has been
damaged. If a damaged seal is used without being replaced,
sand and dirt may enter the pin portion and cause abnormal
wear of the pin.
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...