TRANSPORTATION
HIGH REACH DEMOLITION MANUAL
7-50
WARNING
Switch off the machine and place the supplied warning tag
onto the safety lock lever.
5.
Assemble the work equipment support to the work equipment
brackets. The demolition work equipment stand is in two sec-
tions. Each section consists of three items:
6.
Insert pins (supplied with the machine) to locate the boom
brackets onto the Stand brackets. (position A, B, Action 1).
WARNING
Securely fix the pins with the spring pins supplied. (position
C), Action 2.
7.
Using suitable supports and handling equipment, assemble
the Support Braces (Item 3) to the Left and Right Support
(Items 1 and 2), to form the complete Stand Section, shown in
the diagram.
WARNING
Securely fix the brace pins with the spring pins provided.
8.
Slowly lift the work equipment, so that both supports are lifted
from the ground.
APPROACH THE TRAILER
9.
Make sure the trailer is firmly secured and will not move when the machine approaches. Take care not to
strike the trailer with either the work equipment or the stands.
10. Slowly mount the trailer, making sure at all times that the tracks are properly aligned with the trailer. If the
machine becomes misaligned, reverse the machine from the trailer and start again. NEVER try to steer or
slew the machine when it is in contact with the trailer. Do not exceed an angle of 15 degrees from the horizon-
tal, as shown.
11. As the machine slowly travels onto the trailer, the weight of the work equipment will rock the machine onto the
trailer. Gently move the machine further onto the trailer, so that it stabilises.
Item
Quantity
1
Left Support
1
2
Right Support
1
3
Support Brace
2
C
A
B
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...