6.
Operate each work equipment control lever and attach-
ment control pedal fully to the front, rear, right, and left a
few times within 15 seconds to release the internal pres-
sure in the hydraulic circuit.
7.
Set the lock lever to LOCK position (L).
8.
Loosen the oil filler cap (F) slowly on the top of the hy-
draulic tank to release the internal pressure in the hydraul-
ic tank.
9.
Check that the hydraulic oil temperature is low.
10. Remove the plates (4) (2 places at the outlet and inlet).
Be careful not to lose or damage the removed parts.
Be careful not to get any dirt or mud on the hose fitting.
If an O-ring is damaged, replace it with a new one.
11. Connect the hose on the attachment side.
Check the direction of flow of the oil and be careful not to
make any mistake.
ATTACHMENTS AND OPTIONS
HANDLE MACHINE READY FOR INSTALLATION OF ATTACHMENT
6-19
Содержание HB365LC-3
Страница 2: ......
Страница 25: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 5...
Страница 73: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 348: ......
Страница 349: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 436: ......
Страница 437: ...SPECIFICATIONS 5 1...
Страница 441: ...HB365LC 3 SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 442: ...HB365NLC 3 SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 489: ...REPLACEMENT PARTS 7 1...
Страница 505: ......
Страница 506: ...HB365LC 3 HYDRAULIC EXCAVATOR Form No UENAM01292 2017 KOMATSU All Rights Reserved Printed in Belgium 02 2017...