.
ATTACHMENTS, OPTIONS
MINING SPECIFICATION MACHINE
EVERY 1000 HOURS SERVICE
CHANGE OIL IN POWER TRAIN CASE, CLEAN STRAINERS
(Including transmission case, torque converter case, and bevel gear case.)
WARNING
Immediately after the machine is operated, the oil is very hot. Accordingly, wait until it has cooled down before starting the
work.
The undercover is heavy. Never open and close operation right below the undercover. When removing bolts, work behind the
right below and be ready for escaping at any time.
Refill capacity: 210 liters (55.48 US gal)
1. Remove the cover on the bottom of the rear body.
2. Pull out hose (1), then loosen drain plug (2) and drain the oil.
3. After draining the oil, tighten drain plug (2).
4. Insert hose (1) inside the cover, then install the cover.
5. Remove the cover on left fender, remove bolts (3) and case (4).
6. Take out strainer (5) and magnet (6).
If any damage to strainer (5) or magnet (6) is found, replace
with a new one.
6 - 54
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...