.
MAINTENANCE
SERVICE PROCEDURE
EVERY 250 HOURS SERVICE
LUBRICATING
1. Lower the work equipment to the ground, then stop the engine.
2. By using a grease pump, pump in grease through the grease fittings shown by arrows.
3. After greasing, wipe off any old grease that was pushed out.
(1) Blade lift cylinder support yoke (4 places)
(2) Blade lift cylinder support shaft (2 places)
(3) Blade-arm ball joint (3 places)
Center link pin (1 place)
(4) Brace screw (2 places)
(5) Ripper tilt cylinder bottom pin (2 places)
(6) Ripper lift cylinder bottom pin (2 places)
(7) Ripper tilt cylinder rod end pin (2 places)
(8) Ripper lift cylinder rod end pin (2 places)
(9) Ripper arm pin (front) (2 places)
(10)Ripper arm pin (rear) (2 places)
The illustration on the right shows Giant Ripper (if equipped).
4 - 60
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...