.
OPERATION
OPERATION
OPERATION
OPERATION
3. Operate blade control lever (3) and ripper control lever (4) to
RAISE (a) position so that the blade will rise above the ground
by 40 cm to 50 cm (15.8 in to 19.7 in) and the ripper will rise to
the upper limit.
4. Turn fuel control dial (5) to High idle (MAX) position, raise the
engine speed, and fully depress decelerator pedal (6).
5. Move joystick (steering, directional and gear shift lever) (7) to
F (forward) or R (reverse) position, gradually release
decelerator pedal (6) and allow the machine to move.
3 - 127
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...