.
OPERATION
OPERATION
OPERATION
OPERATION
3. Check that engine pre-heating pilot lamp (3) on the monitor
panel lights up.
If the engine pre-heating pilot lamp does not light, go to step 5.
4. Keep in this condition until engine pre-heating pilot lamp (3)
goes out.
(Pre-heating is completed after approx. 12 seconds, and the
lamp goes out.)
5. When preheating pilot lamp (3) goes off, turn the key of ignition
switch (2) to START position (C) to crank the engine.
The time that preheating pilot lamp (3) stays on changes
according to the ambient temperature as shown in the table
below.
Ambient temperature
Pre-heat time
0
°
C (32
°
F) to
-20
°
C (-4
°
F)
20 to 40 seconds
-20
°
C (-4
°
F) or less
40 seconds
6. When the engine starts, release the key in starting switch (2).
The key will return automatically to ON position (B).
3 - 116
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...