.
MAINTENANCE
SERVICE PROCEDURE
CHECK PIVOT BEARING OIL LEVEL, ADD OIL
1. Remove plug (1).
When removing plug (1), be careful not to let dirt or dust get it.
2. Check that the oil is up to oil level (2) in the diagram.
If the oil level is low, add oil through the hole for plug (1).
(B): 10 to 30 mm (0.4 to 1.2 in)
CHECK OIL LEVEL IN RECOIL SPRING, ASSIST CYLINDER CASE, ADD OIL
1. Remove bolts (1), then remove cover (2).
When removing the cover, be careful not to let dirt or sand get
in.
2. Loosen the plug and confirm that the internal pressure is
released.
Insert a scale and check that the oil level (a) is 90 to 110 mm (3.5
to 4.5 in) from the bottom edge of the inspection port.
If the oil is insufficient, add oil.
CHECK ALTERNATOR, STARTING MOTOR
The brushes may be worn or the bearing may have run out of grease, ask your Komatsu distributor for inspection
and repairs.
If the engine is started frequently, have this inspection performed every 1000 hours.
4 - 85
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...