.
ATTACHMENTS, OPTIONS
MINING SPECIFICATION MACHINE
ATTACHMENTS, OPTIONS
MINING SPECIFICATION MACHINE
7. Loosen bolt (7), then divide into strainer (5) and magnet (6).
Tightening torque of bolt (7): 46 to 59 Nm (4.7 to 5.9 kgm, 34
to 43 lbft)
8. Remove all dirt from strainer, then wash in clean diesel oil or
flushing oil.
Clean the case interior and the removed parts.
9. Install the strainers to their original position.
10. After installing, replace the element in the power train oil filter.
For details, see "EVERY 500 HOURS SERVICE (PAGE
4-68)".
11. Refill the specified quantity of oil through oil filler port (F).
12. After adding oil, check that the oil is at the specified level. For
details, see "CHECK OIL LEVEL IN POWER TRAIN CASE,
ADD OIL (PAGE 3-94)".
If a quick coupler is installed for draining or adding power train oil,
use the quick coupler.
Quick coupler
Manufacturer: WIGGINS
Model: ON2
Mounting screw
Size: 3/4-14 NPT
NOTICE
If the quick coupler is not installed securely, oil may be sent flying around
during refilling. For safety, use the quick coupler with the box cover closed.
6 - 55
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...