ATTACHMENTS, OPTIONS
EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
LEVELING (SPREADING) OPERATION
Perform this operation with R itch.
When perform this operation with R pitch, the end bit does not dig
in, and the ground can be leveled ( or the soil can be spread
smoothly.)
REMARK
If the tilt cylinder is moved completely to the end of its stroke, the
tilt operation cannot be performed on one side, so move the
cylinder back slightly from the end of its stroke to S pitch position.
DITCHING OPERATION
If the dual tilt is used, the digging width becomes smaller and a
deeper ditch can be dug.
If R pitch is used, the digging can be performed gradually, and this
reduces the unevenness.
BOULDER RAISING OPERATION
Because the dual tilt greatly increases the amount of tilt, the blade
can dig in deep and hook under the boulder. In addition, the
operating stroke is large, so operations to raise boulders can be
performed effectively.
(D): Dual tilt
(S): Single tilt
6 - 17
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...