.
MAINTENANCE
SERVICE PROCEDURE
MAINTENANCE
SERVICE PROCEDURE
NOTICE
When inserting the element, if the rubber at the tip is swollen or the outer
element is not pushed in straight, and cover (3) is assembled by force to
hook (2), there is danger that the hook and air cleaner body may be
damaged, so be careful when assembling.
8. Install cover (3) as follows.
1) Align cover (3) with the element.
2) Hook the tip of hook (2) to the protruding part of the air
cleaner body and lock it in position.
3) When locking hooks (2) in position, apply the hooks in turn
on opposite sides (top, bottom, left, right) in the same way
as when tightening bolts.
4) When cover (3) is installed, check that the clearance
between the air cleaner body and cover (3) is not too large.
If it is too large, install again.
4 - 29
Содержание D475A-5E0
Страница 2: ... 1 1 ...
Страница 14: ... 2 1 ...
Страница 53: ... ...
Страница 54: ... 3 1 ...
Страница 243: ... ...
Страница 244: ... 4 1 ...
Страница 256: ... MAINTENANCE RECOMMENDED FUEL COOLANT AND LUBRICANT ASTM American Society of Testing and Material 4 13 ...
Страница 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Страница 338: ... 5 1 ...
Страница 340: ... 6 1 ...
Страница 401: ... ...
Страница 405: ... D475A 5E0 BULLDOZER Form No PEN00537 05 2016 KOMATSU All Rights Reserved Printed in Japan 12 16 ...