78
●Area Calculation
Area calculation of a serial of points defined by point code.
●Radiation
Coordinates of a point can be computed by entering bearing and distance.
●Missing Line measurement
The slope distance, horizontal distance and vertical distance between two points can be
computed.
●Batter boards
A program for setting out in building construction area. If two points can not be setout,
a batter board can be placed in the vicinity. The intersection point of the line
connecting two setout points and the batter board can be found.
●Tape Dimension
Tape dimension is a program which integrates surveying using a total station and a
measuring tape. This program is especially useful when a quick survey of an object is
required.
9. PROJECT
In standard survey menu, click [Project].
This menu allows following functions be performed:
(1) Create, open, delete job file (2) Setting job option
(3)Set scale factor (4) Data export/import
Standard measuring program require that every time measuring you must create a job
file name, if not, system will create a default file name (default) automatically. All the
measuring results will be saved in this file.
9.1 CREATE NEW PROJECT
Create a new project file. A job name has a maximum of 16 characters and should be
Содержание KTS-470 R Series
Страница 10: ...10 1 NOMENCLATURE AND FUNCTIONS 1 1 NOMENCLATURE...
Страница 11: ...11...
Страница 125: ...125 A New codes are added under the layer B A new code layer and code will be created A B...