13.2.5 Alignment Setout
After setting road data, you can start setting out
For an alignment setout a horizontal alignment must have been uploaded from
computer by using [Set Out]→[Alignment].
● the vertical alignment is optional, but is required to compute cut and fill. The
defining method is same as defining horizontal alignment.
Rule
:
Offset left: the horizontal distance from the left stake point to the center line.
Offset right: the horizontal distance from the right stake point to the center line.
Elevation difference: Left (right) is the elevation difference between left (right)
stake and the center line point.
Example
:
Please set the occupied point and backsight azimuth firstly.
OPERATIONAL STEPS
KEY
DISPLAY
①
In Alignment Layout screen,
enter the start chainage, chainage
increment, and the horizontal
distance from side stake point to
center line.
To setout dig/fill data, the height
difference is needed.
Содержание KTS-470 R Series
Страница 10: ...10 1 NOMENCLATURE AND FUNCTIONS 1 1 NOMENCLATURE...
Страница 11: ...11...
Страница 125: ...125 A New codes are added under the layer B A new code layer and code will be created A B...