169
②
Input the Pt used for MLM
measurement.
※
1)
(If occupied point and Backsight
azimuth has not been defined, the
dialog box as right will pops up.)
If the entered point doesn‟t exist in
project, program will request you to
measure this point.
Set Occ.& BS point:
Pt does not exist in project:
③
The result is calculated out and
displayed.
dHd
:
Horizontal distance between
the two points.
dVd
:
Height difference between
two Points
;
dSd
:
Slope distance between two
points.
④
Press [ESC] to quit and return to
Standard Survey Main Menu.
[ESC]
※
1) To call coordinate data from project, Click [Load].
[Note]
:
dVd is defined as the height of the second point minus the height of the first
point. Due to this reason dVd can be negative.
dSd is defined as the length of the missing line.
Содержание KTS-470 R Series
Страница 10: ...10 1 NOMENCLATURE AND FUNCTIONS 1 1 NOMENCLATURE...
Страница 11: ...11...
Страница 125: ...125 A New codes are added under the layer B A new code layer and code will be created A B...