EN UG-020 Link 6 user guide r1.0
262
Quarterly maintenance
Always perform quarterly tasks every three months to avoid downtime of the robot.
Table 101: Quarterly checks for preventive maintenance
Validation task
Corrective action
Check the main power is secured to the controller.
Reattach the latch.
Check all connected safety inputs and outputs are
secured and functioning.
Contact support at [email protected].
Check the cable and connector of the Teach
pendant are in good shape.
Contact support at [email protected].
Torque check the base fastener.
Retorque.
Torque check the wrist fastener and end effector
tooling.
Retorque.
Make sure the actuator covers are not loose.
Retorque.
Check that the fan in the controller is rotating freely. Contact support at [email protected].
Yearly maintenance
Always perform yearly tasks every year to avoid downtime of the robot.
Table 102: Yearly checks for preventive maintenance
Validation task
Corrective action
Check Protective earth grounding resistance is less
than 0.1 Ω to the controller.
Replace the cable.
Check Protective earth grounding resistance is less
than 0.1 Ω to the arm.
Replace the cable.
Unscheduled maintenance
Even by following a maintenance schedule, unexpected maintenance is required.
Some of the unscheduled maintenance tasks are also scheduled maintenance tasks under
certain circumstances. For instance, when there is a sudden power outage or when an accident
happens with the robot, it is recommended to perform a visual inspection of the robot.
Table 103: Unscheduled maintenance tasks
Validation task
Corrective action
Cables are in good condition with no rips, tears, or
frays.
Contact support at [email protected].
Make sure the joint caps are on the robot. Also,
make sure there are no visible gaps and that they
are secured in place.
Contact support at [email protected].
+1 514-277-3777
kinovarobotics.com
© 2022 Kinova inc. All rights reserved.
Содержание Link 6
Страница 1: ...Link 6 user guide Optional gripper shown ...
Страница 8: ......