Page 204
CAT: 8612 November 2019
OPERATING INSTRUCTIONS
Recovery Rigging
To connect to the vehicle, follow the suggested rigging methods below.
Use a double chain or cable setup that distributes the load equally to both
hitches. See illustration below.:
1.
Use a spreader or equaliser bar to distribute the load on both
hitches.
2. If no spreader bar is available, connect the main tow chain or
cable no closer than 2 metres from the vehicle.
3. Never loop a single chain or cable through both hitches.
1. Spreader Bar or Equaliser 2. Minimum 2m
Preferred Acceptable
3.
NEVER USE SINGLE CHAIN OR CABLE
LOOPED THROUGH TOW DEVICES
Содержание T410
Страница 4: ......
Страница 6: ......
Страница 16: ...Page xiv CAT 8612 November 2019 CONTENTS ...
Страница 24: ...Page xxii CAT 8612 November 2019 CONTENTS ...
Страница 25: ...SECTION ONE OPERATING INSTRUCTIONS ...
Страница 26: ......
Страница 237: ......
Страница 238: ...SECTION TWO PREVENTIVE MAINTENANCE ...
Страница 239: ......
Страница 330: ......
Страница 331: ...SECTION THREE MAINTENANCE LUBRICATION SCHEDULES ...
Страница 352: ...Page 326 CAT 8612 November 2019 CHASSIS LUBRICATION POINTS 2 3 4 5 26 8 25 27 12 13 14 20 19 1 22 23 24 28 9 10 6 7 11 ...
Страница 369: ...SECTION FOUR SERVICE RECORDS ...
Страница 406: ......
Страница 416: ......
Страница 417: ......