Put the gear tank behind the gear box and install the oil return pipe.
(17)
(19) Connect the cables according to the mark of cable and electrical box.
Connect the lubricant tank according to the mark of oil pipe.
Put the cooler behind the gear tank.
(18)
(20)
operator and machine damage.
Ladders for maintenance of the machine-specific shall be arbitrarily with
(26)
hanging useful to work such as maintenance when the ladder.
Please operate the machine before demolition work ladder avoid danger.
(22) After the table and spindle alignment, then the X-axis origin can be determined.
Set the X-axis origin is equal to the change point of tool.
(23)
(24) Assemble all metal sheets on wooden board.
Connect the ground wire after finishing the installation, to avoid leakage caused
(25)
(21) Confirm the Z axis is aligned with the center of table, if not aligned on, it needs to
adjust the column position, then check the figures of adjusting block on the rear of the
column. If not, Tune to same as the figures. If yes, measure the different distance
between Z-axis and the center of table. Make adjustment by column adjusting block.
Cooler HBO2RPSA
Gear box tank
Gear box
Oil return pipe
Oil return pipe
Cable connector