R AD AR
10
1.5
1.6
Notice of operating completion
(1)
(2)
(4)
(5)
(3)
Should move each axis back to the origin-return position.
As spindle stop, all parts should be removed.
AS operating is completed, the operator should turn off power completely before
leaving the working area.
Turn off the power as follows: First press the emergency switch and then off the control
panel power switch, then turn off main power in the rear of machine.
Be sure to turn off the machine power supply and connected to the main power supply
of the electrical box, and if you just turn off. Machine power supply, power may
continue to supply to the operating area, and may also cause electric shock.
After the power is off, with the spindle of the servo amplifier probably will be for some
time. Electricity, so even if the amplifier is turned off, there is a risk of electric shock.
Power is off. At least more than 20 minutes to make these go away.
The CNC operation and maintenance existing of different risk, it must be performed by a
qualified technician. Users should note the related safety requirements and must read
the operation manual carefully before operating.
1.7
Notice of abnormal conditions
(1)
(2)
(4)
(3)
When an exception occurs, the operator should press down the red emergency button
on the control panel.
The responsible officer should immediately deal with the problem as pressing the
emergency button.
The responsible officer should define the problems clearly and assist to resolve
problems.
When replacing the fuse or some other consumable components, should choose the
right parts to do the replacement.
When repair or maintain the electrical box parts, please contact the maker to avoid
uncertainty factors occur and cause an accident.
1.
Overall security
1.
Overall security
Property
of
Kent
Industrial
USA
Do
Not
Reproduce