30
INSTALLATION
• Insert the plastic connection supplied with the machine (figure 23) into the female connector at the
bottom left of the rear machine panel.
• Remove the red cap at the top.
• Fill the tank using the funnel provided.
• The limit is reached when the water begins to escape from the upper connector of the tank. The coolant
supplied separately with the machine in the jerrycan corresponds, more or less, to the correct quantity.
• Close the top connector using the red cap and remove the plastic connector.
FILLING THE COOLING LIQUID
Figure 23 – Filling the cooling system
red
cap connector
water level
red
cap connector
water level
red
cap connector
water level
red
cap connector
water level
Содержание 4910880
Страница 1: ......
Страница 4: ......
Страница 6: ...SAFETY ...
Страница 18: ...INTRODUCTION ...
Страница 24: ...INSTALLATION ...
Страница 40: ...SETTING THE MACHINE PARAMETERS ...
Страница 44: ...WELDING WITH THE ENESKAlaser 1500 mobile ...
Страница 48: ...TROUBLESHOOTING FAULT MAINTENANCE ...
Страница 60: ...GENERAL SAFETY REQUIREMENTS DURING WELDING ...
Страница 65: ...NOTE ...
Страница 66: ...NOTE ...
Страница 67: ...NOTE ...