SECTION 5 – SEQUENCE OF OPERATION
The following criteria must be met for Morning Warm
up operation:
•
Morning Warm up will only work on a VAV sys-
tem.
•
Morning Warm up will only work when the in-
ternal scheduling feature is used. It will not work
using a hard wired or communicated Occupied
command.
•
Morning Warm up will only function during the
first occupied period of each day
.
Sequence of Operation
On Morning Warm up the following applies:
•
One hour before the beginning of the occupied pe-
riod the Simplicity Elite control will energize the
supply fan circuit.
•
The Simplicity Elite control will keep the econo-
mizer damper closed.
•
After 5 minutes of supply fan operation the Sim-
plicity Elite control will compare the return air
temperature to the
“MORNING WARM UP/VAV
RETURN AIR TEMP SETPOINT”
.
•
If the return air temperature is 2.0° F or more be-
low the “
MORNING WARM UP/VAV RETURN
AIR TEMP SETPOINT”
the Simplicity Elite con-
trol will energize all the available heat.
•
If the return air temperature is not 2.0° F or more
below the
“MORNING WARM UP/VAV RETURN
AIR TEMP SETPOINT”
the Simplicity Elite con-
trol will continue supply fan operation while con-
tinuing to monitor the return air temperature.
•
When the return air temperature is equal to or
above the
“MORNING WARM UP/VAV RETURN
AIR TEMP SETPOINT”
heating operation will be
de-energized.
•
During this time the heat will cycle ON and off
based on the comparison of the return air tempera-
ture to the
“MORNING WARM UP/VAV RETURN
AIR TEMP SETPOINT”.
•
A
fter one hour of operation the Simplicity Elite
control will go into the Occupied mode and open
the economize to the minimum position.
•
Heating operation will continue until the return
air temperature is equal to or above the
“MORN-
ING WARM UP/VAV RETURN AIR TEMP
SETPOINT”.
HYDRONIC HEAT
The following parameters must be programmed to use
Hydronic Heat:
•
“HEATING MODE ENABLED FOR OPERA-
TION”
must be enabled using Parameter 54 under
the PROGRAM key of the Simplicity Elite con-
trol board or under the HEATING SETUP tab in
the Simplicity PC software package.
•
“HYDRONIC HEATING ENABLED”
must be en-
abled using Parameter 18 under the PROGRAM
key of the Simplicity Elite control board or under
the HEATING SETUP tab in the Simplicity PC
software package.
•
“HYDRONIC HEATING STAGE #1 SUPPLY AIR
SETPOINT”
must be programmed using Parame-
ter 19 under the PROGRAM key of the Simplicity
Elite control board or under the HEATING SET-
UP tab in the Simplicity PC software package.
•
“HYDRONIC HEATING STAGE #2 SUPPLY AIR
SETPOINT”
must be programmed using Parame-
ter 20 under the PROGRAM key of the Simplicity
Elite control board or under the HEATING SET-
UP tab in the Simplicity PC software package.
Sequence of Operation
On Constant Volume units whenever there is a call for
the 1st stage of heating operation the Simplicity Elite
control will vary a 2 to 10VDC output to the hydronic
valve to try and maintain the supply air temperature
to within plus or minus 1.0° F of the
“HYDRONIC
HEATING STAGE #1 SUPPLY AIR SETPOINT”
. The
output to the valve can be found at terminal “HWV+”
and “HWV-“ at connector P14 on the Simplicity Elite
control board.
On Constant Volume units whenever there is a call for
the 2nd stage of heating operation the Simplicity Elite
control will vary a 2 to 10VDC output to the hydronic
valve to try and maintain the supply air temperature
to within plus or minus 1.0° F of the
“HYDRONIC
HEATING STAGE #2 SUPPLY AIR SETPOINT”
.
On a VAV unit whenever there is a call for heat the
Simplicity Elite control will vary the 2 to 10VDC
output to the hydronic valve to try and maintain the
supply air temperature to within plus or minus1° F of
the
“HYDRONIC HEATING STAGE #2 SUPPLYAIR
SETPOINT”.
Содержание 050
Страница 112: ...JOHNSON CONTROLS 112 FORM 100 50 NOM6 ISSUE DATE 8 07 2017 SECTION 6 USER INTERFACE SENSOR READINGS LD13017 ...
Страница 113: ...JOHNSON CONTROLS 113 SECTION 6 USER INTERFACE FORM 100 50 NOM6 ISSUE DATE 8 07 2017 6 ECONOMIZER EXHAUST LD13018 ...
Страница 114: ...JOHNSON CONTROLS 114 FORM 100 50 NOM6 ISSUE DATE 8 07 2017 SECTION 6 USER INTERFACE FANS LD13019 ...
Страница 115: ...JOHNSON CONTROLS 115 SECTION 6 USER INTERFACE FORM 100 50 NOM6 ISSUE DATE 8 07 2017 6 COOLING SETUP LD13020 ...
Страница 116: ...JOHNSON CONTROLS 116 FORM 100 50 NOM6 ISSUE DATE 8 07 2017 SECTION 6 USER INTERFACE COOLING STATUS LD13021 ...
Страница 117: ...JOHNSON CONTROLS 117 SECTION 6 USER INTERFACE FORM 100 50 NOM6 ISSUE DATE 8 07 2017 6 HEATING SETUP LD13022 ...
Страница 118: ...JOHNSON CONTROLS 118 FORM 100 50 NOM6 ISSUE DATE 8 07 2017 SECTION 6 USER INTERFACE HEATING STATUS LD13023 ...
Страница 119: ...JOHNSON CONTROLS 119 SECTION 6 USER INTERFACE FORM 100 50 NOM6 ISSUE DATE 8 07 2017 6 SYSTEM OPTIONS LD13024 ...
Страница 120: ...JOHNSON CONTROLS 120 FORM 100 50 NOM6 ISSUE DATE 8 07 2017 SECTION 6 USER INTERFACE OUTPUTS STATUS LD13025 ...
Страница 122: ...JOHNSON CONTROLS 122 FORM 100 50 NOM6 ISSUE DATE 8 07 2017 SECTION 6 USER INTERFACE GRAPHIC LD13027 CLOCK LD13028 ...
Страница 125: ...JOHNSON CONTROLS 125 SECTION 6 USER INTERFACE FORM 100 50 NOM6 ISSUE DATE 8 07 2017 6 ALARMS LD13031 ...