P/N 960-100929R_Rev. 7 {EDP #148849}
© 2017, JAPAN CASH MACHINE CO., LTD.
4 - 1 3
Disassembly/Reassembly
iVIZION® Series Next-Generation Banknote Acceptor Unit
Section 4
4. Remove the four (4) CIS Sensor Mounting
a
1
to
a
4
), and remove the CIS
Sensor (Figure 4-45
b
) and the CIS FPC Cable
c
) off of the Lower Validation Sec-
tion.
5. Remove two (2) mounting screws (Figure 4-45
d
1
&
d
2
), securing the Lower UV Sensor (Figure 4-
e
) in place and remove it and the Lower UV
f
) from the Lower Vali-
dation Section.
Figure 4-44
Lower Validation Part Removal
a
1
a
2
b
NOTE: If foreign objects are observed
adhering to the CIS surface, blow it
clean by using a Compressed Air
spray.
Figure 4-45
CIS, CIS FPC, Lower UV Sensor &
Figure 4-45
CIS, CIS FPC, Lower UV Sensor &
Lower UV FFC Removal
d
1
d
2
a
1
a
2
a
3
a
4
c
e
f
NOTE: When reassembling the Unit,
ensure that the UV Sensors are
correctly re-positioned and set in
place as illustrated in Figure 4-48.