![JCM ivizion ld Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/jcm/ivizion-ld/ivizion-ld_operation-and-maintenance_3544215063.webp)
P/N 960-100929R_Rev. 7 {EDP #148849}
© 2017, JAPAN CASH MACHINE CO., LTD.
4 - 7
Disassembly/Reassembly
iVIZION® Series Next-Generation Banknote Acceptor Unit
Section 4
3. Carefully spread both sides of the PCB Support
a
1
&
a
2
) and slide the
Validation CPU Board (Figure 4-25
c
) and the
Controller CPU Board (Figure 4-25
d
) off of the
CPU Board Module.
4. Remove two (2) mounting Screws (Figure 4-25
b
1
&
b
2
), and separate the Validation CPU Board
and the Controller CPU Board from one another.
USB FPC, Power FPC & Interface
FPC Cable Removals
To remove the USB FPC, the Power FPC and the
Interface FPC proceed as follows:
1. Remove the two (2) mounting Screws (Figure 4-
a
1
&
a
2
) securing the Motor Unit to the Trans-
port Assembly, and remove the Motor Module
b
) from the Transport Unit.
2. Remove the USB FPC (Figure 4-27
a
), the Power
b
) and the Interface FPC (Fig-
c
) from the Transport Unit.
Figure 4-25
Validation CPU Board and Control
Figure 4-25
Validation CPU Board and Control
CPU Board Removal
b
2
c
d
a
1
a
2
Figure 4-26
Figure 4-26
Motor Module Removal
a
2
b
Figure 4-27
USB FPC, Power FPC & Interface
Figure 4-27
USB FPC, Power FPC & Interface
FPC Cable Removal
a
b
c
for Fold Up
Solid Line
for Fold Down
NOTE: Carefully observe the Up and
Down Fold Line indications shown
by the two (2)
Cyan
Arrows in Figure
4-27. DO NOT bend them in an
opposite direction!
NOTE: When installing new FPCs,
fold-up along the Solid Lines and
fold-down along the Dashed Lines
before setting them in place. Once
an FPC is folded, DO NOT un-fold it
back again or fold in the opposite
direction.