1. Impeller puller stud - Mach. from std 1" H.H.M bolt
5. 13/16 ± 0 to 1/32
2. 1-1/2 width across flats
6. Impeller
3. 1"112 R.H. threads
7. Shaft
4. 1/16 x 45° chamfer
Figure 56: Impeller Puller Stud
Thread the impeller puller stud into the end of the impeller. This stud pushes against the shaft and
pulls the impeller as the stud is turned clockwise.
8.
Remove impeller key from the shaft.
Do not lose or damage the shaft sleeve O-ring which seals between the impeller and sleeve.
CAUTION:
Risk of physical injury from sharp edges. Wear heavy work gloves when handling impellers.
9.
If unit has mechanical seal, remove gland stud nuts. The gland is a solid ring and cannot be re-
moved after unbolting. Carefully slide the gland off the gland studs and move back on shaft and
shaft sleeve. Avoid contact with exposed lapped seal faces and keep them clean.
Figure 57: Removal of gland stud nuts and gland
10. Remove the adapter to stuffing box bolts. Pull the stuffing box cover from the frame adapter. (On
some units, specifically the 18 and 22 inch units, tapped holes are provided in the frame adapter for
the use of jacking bolts to assist disassembly of the stuffing box cover). Do not allow the stuffing
box cover to strike the shaft, shaft sleeve, or any mechanical seal part.
11.
6.5 Disassemble the Pump
58
3175 Installation, Operation and Maintenance Instructions
Содержание Goulds Pumps 3175
Страница 1: ...Installation Operation and Maintenance Instructions 3175 ...
Страница 2: ......