
Positions
Approximate Run Time
Eight SBS positions
20 minutes
Eight SBS positions and 10 paired-end positions
60 minutes
11 When the wash is complete, measure the delivered volume.
Positions
Total Delivered Volume
Per Lane Delivered Volume
Eight SBS positions
32 ml
4 ml
Eight SBS positions and 10 paired-end
positions
72 ml
9 ml
12 Unwrap the waste tubes and return them to the waste bottle.
Document # 15011190 v03
For Research Use Only. Not for use in diagnostic procedures.
25
HiSeq 2000 System Guide