MAINTENANCE
9VXE EN
3-7
Boom Swing
WB-C310020
Greasing interval
No.
Name
Qty
Daily
50h
100h
250h
500h 1000h 2000h
1
Boom swing vertical shaft
(upper)
1
2
Boom swing vertical shaft
(lower)
1
3
Swing cylinder foot pin
1
4
Swing cylinder rod pin
1
Blade
WB-C310030
Greasing interval
No.
Name
Qty
Daily
50h
100h
250h
500h 1000h 2000h
1
Blade foot pin
2
2
Blade cylinder rod pin
1
3
Blade cylinder foot pin
1
•
Lubricate the machine everyday until its operation time reaches 100 hours, if it is a new
machine.
•
Carry out greasing, regardless of the greasing interval, if abnormal noises are
generated from a greasing point.
•
Be sure to grease the pins around the bucket before starting in-water digging.
Содержание 9VXE
Страница 2: ......
Страница 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Страница 10: ...9VXE EN ...
Страница 28: ...9VXE EN ...
Страница 66: ...OPERATION 9VXE ENG 2 38 ...
Страница 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Страница 69: ...9VXE EN ...
Страница 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Страница 102: ...MAINTENANCE 9VXE EN 3 33 ...
Страница 108: ...9VXE EN SPECIFICATIONS ...
Страница 109: ...9VXE EN ...
Страница 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Страница 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Страница 117: ......
Страница 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...