OPERATION
9VXE ENG
2-14
RUNNING IN NEW MACHINE
If a new machine is used by force, the
performances may be deteriorated earlier and the
service life may be shortened. Run in the machine
for the initial 50 hours.
Follow the instructions below and run in the new
machine.
1. Warm up the machine sufficiently.
2. Do not run the machine with heavy loads or at high
speed.
Run the machine at about 80% of the maximum engine
revolution.
3. Do not apply the full load to the machine. The
adequate load is 80% or so. Do not run the machine by
force.
4. Do not start, accelerate or stop the machine quickly or
change the direction quickly.
5. Do not apply shocks such as quick stopping of the
boom when lowering it to the machine.
6. Grease the pins of the attachment everyday.
WC-C200460
WC-C200470
WC-C200430
Warming up
Содержание 9VXE
Страница 2: ......
Страница 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Страница 10: ...9VXE EN ...
Страница 28: ...9VXE EN ...
Страница 66: ...OPERATION 9VXE ENG 2 38 ...
Страница 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Страница 69: ...9VXE EN ...
Страница 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Страница 102: ...MAINTENANCE 9VXE EN 3 33 ...
Страница 108: ...9VXE EN SPECIFICATIONS ...
Страница 109: ...9VXE EN ...
Страница 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Страница 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Страница 117: ......
Страница 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...