OPERATION
9VXE ENG
2-35
TRANSPORT
Observe the loading and unloading methods and the anchoring method for transportation as well
as the laws and regulations concerned when transporting the machine.
Loading and Unloading the Machine
•
Carry out operation on a flat and firm ground.
•
Carry out loading or unloading at the low speed without using the travel speed change-
over pedal. Reduce the engine revolution.
•
Be sure to use ramp boards or loading platform for loading and unloading. Never use
the attachment to load or unload the machine. It is very dangerous.
•
Use wide, long and thick enough ramp board that ensures safe loading and unloading.
•
Remove mud from the crawlers and grease, oil, water and other adhered matters from
the ramp boards to prevent slipping.
•
Never change the direction on the ramp boards. It is very dangerous. Move down from
the ramp boards once and change the direction.
•
The center of gravity moves quickly at the border of the truck and the ramp boards.
Travel the machine slowly.
•
Warm up the machine sufficiently before loading or unloading it in cold seasons.
1. Apply the brake of the truck securely. Apply blocks to
the tires to fix the tires.
2. Adjust the center line of the machine to the center line
of the truck. Adjust the ramps boards to the crawler
width.
3. The angle of the ramp boards should be 15° or le ss.
4. Load the machine from the front if it has an attachment.
Load it from the rear if no attachment is mounted.
5. Adjust the machine to the ramp board direction, raise
the blade and travel the machine slowly with care not
to hit the attachment against the truck.
6. Load the machine properly in the designated position
on the truck.
WC-C201130
Ramp board
15º or less
Block
Block
Adjust to the
machine width.
Содержание 9VXE
Страница 2: ......
Страница 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Страница 10: ...9VXE EN ...
Страница 28: ...9VXE EN ...
Страница 66: ...OPERATION 9VXE ENG 2 38 ...
Страница 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Страница 69: ...9VXE EN ...
Страница 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Страница 102: ...MAINTENANCE 9VXE EN 3 33 ...
Страница 108: ...9VXE EN SPECIFICATIONS ...
Страница 109: ...9VXE EN ...
Страница 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Страница 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Страница 117: ......
Страница 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...