OPERATION
9VXE ENG
2-17
Pattern AB changing method
1. It is necessary to re-assemble the reach rods of the left operation lever, if the pattern A
operation system (standard operation system) is changed into the pattern B. Open the cover
on the front of the lever stand and re-assemble the reach rods.
2. The operation system changing plate is stuck on the inside of the lever stand front cover.
3. Lower the attachment onto the ground and stop the engine before re-assembling the reach
rods.
D40538200
WB-C210280
Pattern A positions
Pattern B positions
Pattern A
Pattern B
Operation system changing plate
Pattern A positions
Pattern B positions
Operation system changing plate
Содержание 9VXE
Страница 2: ......
Страница 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Страница 10: ...9VXE EN ...
Страница 28: ...9VXE EN ...
Страница 66: ...OPERATION 9VXE ENG 2 38 ...
Страница 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Страница 69: ...9VXE EN ...
Страница 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Страница 102: ...MAINTENANCE 9VXE EN 3 33 ...
Страница 108: ...9VXE EN SPECIFICATIONS ...
Страница 109: ...9VXE EN ...
Страница 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Страница 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Страница 117: ......
Страница 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...