OPERATION
9VXE ENG
2-24
WORK INSTRUCTIONS
Digging
The digging force of the arm cylinder is maximized when
the angle between the arm cylinder and arm is 90
degrees.
The digging force of the bucket cylinder is maximized
when the angle between the bucket cylinder and the arm
link is the same as the angle between the arm link and
bucket link.
Improve the digging work efficiency, making use of these
angles properly.
In digging, pull the arm to dig with the bucket.
Raise and lower the boom to adjust the depth.
Ditching
Place the machine along the ditch direction and travel it
backward with the progress of ditching.
Loading
After digging, raise the boom, swing and load soil onto the
dump truck.
Gutter Digging
It is possible to dig gutters in narrow spaces by swinging
the boom.
WC-C200710
WC-C200700
When being
the same angle
WC-C200720
WC-C200730
WC-C200740
Содержание 9VXE
Страница 2: ......
Страница 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Страница 10: ...9VXE EN ...
Страница 28: ...9VXE EN ...
Страница 66: ...OPERATION 9VXE ENG 2 38 ...
Страница 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Страница 69: ...9VXE EN ...
Страница 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Страница 102: ...MAINTENANCE 9VXE EN 3 33 ...
Страница 108: ...9VXE EN SPECIFICATIONS ...
Страница 109: ...9VXE EN ...
Страница 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Страница 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Страница 117: ......
Страница 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...