OPERATION
9VXE ENG
2-37
LIFTING THE MACHINE
Lifting the machine incorrectly can cause damage, injury and death.
•
Use adequate steel ropes and equipment for lifting.
•
Use lifting equipment able to support the weight of the machine.
•
NEVER LIFT the machine with anyone on-board.
•
Use signs and other notices to mark off the loading area.
•
Always use ropes and other equipment rated to lift at least 4 ton loads.
1. Set the blade at the rear position.
2. Raise the blade to the highest position.
3. Raise the boom to the highest position and fold the
arm and bucket fully.
4. Make the boom straight if it has swung to the right or
left.
5. Fasten wire ropes to the lifting holes at the back of the
boom using the shackle.
6. Stop the engine and get off the machine.
7. Fasten the wire ropes to the lifting holes at both ends
of the blade using shackles.
8. Lift the machine slowly until it is lifted slightly apart
from the ground, stop lifting once, check the machine
balance, and lift the machine to the intended height.
Boom lifting hole
WB-C210570
Содержание 9VXE
Страница 2: ......
Страница 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Страница 10: ...9VXE EN ...
Страница 28: ...9VXE EN ...
Страница 66: ...OPERATION 9VXE ENG 2 38 ...
Страница 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Страница 69: ...9VXE EN ...
Страница 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Страница 102: ...MAINTENANCE 9VXE EN 3 33 ...
Страница 108: ...9VXE EN SPECIFICATIONS ...
Страница 109: ...9VXE EN ...
Страница 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Страница 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Страница 117: ......
Страница 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...