Operator Guide
A-22
Main Memory Sharing Test
This test is launched by the BUMP and performed by all configured processors. It has a
sub-test to check the capability of all the processors to access the main memory. The
following h/w parts are checked during the process:
1. DCB ASICs
2. IONIAN ASICs
3. SSGA ASIC
4. SMC ASIC
BUMP displays the overall test results.
Multi Resource Sharing Test
BUMP launches and manages the test results. All configured processors perform this test. It
has one sub-test, which checks the capability of all the processors to access the following
I/O resources simultaneously:
1. Main Memory
2. NVRAM
3. Async Lines
The following h/w parts are checked during the process.
1. DCB ASICs
2. IONIAN ASICs
3. SSGA ASIC
4. SMC ASIC
Multi Resources Full Test
This test is the hardest
test performed by the machine. To be fully efficient, it must be:
•
launched on three processors at least (one of them is used as a de-synchronize
processor).
•
performed during thirty seconds at least. Its main characteristic is to perform random
accesses into main memory, with a very high implication of L1 and L2 caches.
Содержание 7013 J Series
Страница 1: ...7013 J Series Operator Guide SA23 2724 02 ...
Страница 12: ...xii Operator Guide ...
Страница 16: ...xvi Operator Guide ...
Страница 18: ...xviii Operator Guide ...
Страница 32: ...1 14 Operator Guide ...
Страница 80: ...2 48 Operator Guide ...
Страница 166: ...5 14 Operator Guide ...
Страница 186: ...7 4 Operator Guide ...
Страница 226: ...9 28 Operator Guide ...
Страница 258: ...B 8 Operator Guide ...
Страница 268: ...D 4 Operator Guide ...
Страница 297: ...Printed in the U S A SA23 2724 02 93H6489 ...