![IAI RoboNet Скачать руководство пользователя страница 300](http://html1.mh-extra.com/html/iai/robonet/robonet_operation-manual_604045300.webp)
280
Part 2 Startup Chapter
(4) Writing the parameters
When all necessary items have been edited (set),write the parameters to the GateWayR unit.
When writing the parameters, set the operation mode of the GateWayR unit to “MANU.”
[1] Click
the
Write
button.
[2]
When a message box appears to confirm writing of parameters, click
Yes (Y)
.
[3]
When all parameters have been written, click the
OK
button.
Содержание RoboNet
Страница 1: ...Operation Manual Forth Edition ROBONET ...
Страница 242: ...222 Part 1 Specification 5 4 3 External Dimensions 50 from DIN rail center 35 mm DIN rail 69 3 from DIN rail surface ...
Страница 257: ...237 Part 2 Startup Chapter X Installed face down X Installed face up ...
Страница 354: ...334 ...
Страница 395: ...375 ...
Страница 396: ...376 ...
Страница 397: ...377 ...