7-3
3. COMPLETING WORK
If the coolant has been drained, tighten the drain valve, and add water to the specified level. Run
the engine to circulate the water through the system. Then check the water level again.
If the hydraulic equipment has been removed and installed again, add engine oil to the specified
level. Run the engine to circulate the oil through the system. Then check the oil level again.
If the piping or hydraulic equipment, such as hydraulic cylinders, pumps, or motors, have been
removed for repair, always bleed the air from the system after reassembling the parts.
Add the specified amount of grease(Molybdenum disulphide grease) to the work equipment related
parts.
1)
2)
3)
4)
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...