4-11
CHECK POINT
1. POWER CIRCUIT
The negative terminal of battery is grounded to the machine chassis.
When the start switch is in the OFF position, the current flows from the positive battery terminal as
shown below.
OPERATING FLOW
Battery Master switch[CS-74] Fusible link(CN-60) Start switch[CS-2(1)]
I/conn[CN-5(2)]
Engine
Start switch
Check point
Voltage
1)
ö
GND : Ground
OFF
OFF
Η
- GND (Battery)
Θ
- GND (Master switch)
Ι
- GND (Fusible link)
10~12.5V
2
2
)
ö
I/conn : Intermediate connector
Fuse box[No.1] I/conn[CN-8(5)] I/conn[CN-1(1)] Cluster[CN-48(1)]
I/conn[CN-11(1)]
Room lamp[CL-1(1)]
Cassette radio[CN-27(11)]
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...