7-90
1. REMOVAL AND INSTALL
REMOVAL
Lower the work equipment to the ground
and stop the engine.
Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrate the skin causing serious injury.
Loosen the socket bolt(1).
Remove the cover of the console box.
Disconnect pilot line hoses(3).
Remove the pilot valve assembly(2).
When removing the pilot valve assembly,
check that all the hoses have been
disconnected.
INSTALL
Carry out installation in the reverse order
to removal.
Confirm the hydraulic oil level and check
the hydraulic oil leak or not.
GROUP 7 RCV LEVER
1)
2)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
ö
(1)
(2)
1
2
3
13031GE18
21078DA06
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...