
7-94
Turn joint anticlockwise to loosen it,
utilizing jig(Special tool).
When return spring(8, 9) is strong in force,
plate(31), plug(14) and push rod(12, 13)
will come up on loosening joint.
Pay attention to this.
(7)
ö
Loosen adjusting nut(22) and plate(31)
with spanners on them respectively, and
remove them.
(6)
RE04 (140-7)
RE05 (140-7)
RE06 (140-7)
RE07 (140-7)
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...