4-15
3. CHARGING CIRCUIT
When the starter is activated and the engine is started, the operator releases the key switch to the ON
position.
Charging current generated by operating alternator flows into the battery through the battery
relay(CR-1).
The current also flows from alternator to each electrical component and controller through the fuse
box.
OPERATING FLOW
Warning flow
Alternator "L" terminal
I/conn [CN-2(13)] Cluster [CN-56(3)] Cluster warning lamp
Charging flow
Alternator "B
+"
terminal
B) terminal
CHECK POINT
Engine
Start switch
Check point
Voltage
Η
- GND (Battery voltage)
Θ
- GND (Alternator B
+
terminal)
Ι
- GND (Cluster)
1
1)
2)
(1)
(2)
ö
GND : Ground
ON
ON
10~12.5V
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...