STEP 4. Inspect the trouble actually on the
machine
In case that some trouble cannot be confirmed,
obtain the details of the malfunction from the
operator.
Also, check if there are any in complete
connections of the wire harnesses are or not.
STEP 5. Perform troubleshooting
According to where the trouble parts are
located, hydraulic & mechanical system part or
electrical system part or mechatronics system
part, perform troubleshooting the machine refer
to the each system part's troubleshooting
process diagram.
STEP 6. Trace a cause
Before reaching a conclusion, check the most
suspectible causes again. Try to trace what the
real cause of the trouble is.
Make a plan of the appropriate repairing
procedure to avoid consequential malfunctions.
6-3(1) 140-7
13031SH05
6-3(3) 140-7
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...