
6-19
G1
G2
G3
A3
A2
A1
MAIN PUMP DELIVERY PRESSURE
Preparation
Stop the engine.
Push the pressure release button to
bleed air.
To measure the main pump pressure.
Loosen the cap of screw coupling and
connect pressure gauge to the main
pump gauge port(G1, G2, G3) as shown.
Start the engine and check for oil
leakage from the port.
Keep the hydraulic oil temperature at 50
Ü
5
Á
C.
M
M
easurement
Measure the main pump delivery
pressure at high idle.
Evaluation
16)
(1)
(2)
Η
Η
Θ
Ι
Κ
Λ
The average measured pressure should meet the following specifications.
Unit : kgf / cm
2
Model
R35Z-7
Engine speed
High ilde
Standard
20
Ü
5
Allowable limits
-
Remarks
(
(
3)
R35Z76MC17
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...