4-13
2. STARTING CIRCUIT
OPERATING FLOW
B) terminal Master switch[CS-74] Fusible link[CN-60]
Start key[CS-2(1)]
I/conn[CN-5(2)] Fuse box No.1
Safety relay[CN-165(1)]
Power relay[CR-35(30)]
ö
S
S
tart switch : ON
Start switch ON [CS-46(2,3)] I/conn [CN-7(1)]
Fuse box No. 2, 3 (Power is supplied)
Safety relay[CN-165(3)]
Power relay[CR-35(85)
Ą
(87)]
Fuse box(All power is supplied with electric component)
ö
S
S
tart switch : START
Start switch START [CS-46(4)] I/conn [CN-6(7)]
Safety relay[CN-165(1)] [CN-166(2)] I/conn[CN-5(1)]
Starter[M] Start motor operating
Timer for air heater[CN-62(4)]
CHECK POINT
Engine
Start switch
Check point
Voltage
Η
GND (Battery)
Θ
GND (Start key)
Ι
GND (Starter B
+
)
Κ
GND (Starter M)
1
1)
2)
ö
GND : Ground
Operating
Start
10 ~ 12.5V
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...