
4-19
5. BEACON LAMP CIRCUIT
OPERATING FLOW
Fuse box (No.19) l/conn[CN-6(15)] Beacon lamp switch[CN-23(5)]
Beacon lamp switch ON
Beacon lamp switch ON [CS-23(1)]
Switch lndicator lamp ON [CS-23(9)]
l/conn[CN-3(1)] l/conn[CN-1(5)] l/conn[CN-11(8)] Beacon lamp ON [CL-7]
CHECK POINT
1)
2)
(1)
ö
GND : Ground
Engine
Start switch
Check point
Voltage
STOP
ON
Η
- GND(Fuse box)
Θ
- GND(Switch power input)
Ι
- GND(Switch power output)
Κ
- GND(Beacon lamp)
10~12.5V
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...