2-28
Dozer down operation
T1
P3
Boom swing
P3
To cylinder head
side via B1 port
To A1 port via
Cylinder rod side
Spool changeover
direction
B1
A1
Swing
Dozer
To bridge passage
in dozer comp.
Supply
(connecting)
Pb1
R35Z72MCV23
Dozer down operation
When the dozer down operation is carried out, the secondary pressure from the remote control
valve is applied to Pb1 port to change over the dozer spool.
Since the P3 side bypass passage is shut off at the dozer section after the dozer spool changeover,
the oil flowed from P3 port through the P3 side parallel passage flows into B1 port through the load
check valve in the dozer section and the bridge passage since B1 port and the bridge passage
have been opened after the spool changeover and then into the head side of the dozer cylinder.
On the other hand, the oil returned from the rod side of the dozer cylinder flows into A1 port to the
tank passage that has opened with the spool's notch after the spool changeover.
Then, the dozer cylinder extends to lower the dozer.
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...